The factory is equipped with latest technology and an integrated system for reduced energy consumption and in full compliance with environmental regulations. The extrusion lines have been specially designed to ensure efficiency and accuracy.
The industrial plant rises on an acquired land of 12.000 square meters. The plant has been built accordingly to the most recent environmental and safety rules: the actual covered area is 1500 square meters.